Production operations : well completions, workover and stimulation / Thomas O. Allen and Alan P. Roberts.
Material type:
TextPublication details: Tulsa : OGCI Consultants International, 1984.Edition: 2nd.edDescription: 2 vols. il., tbl., grafISBN: - 0-930972-04-x
- 14 624.1
Libro, folleto, traducción
List(s) this item appears in:
Ing.Petróleo Plan Nuevo
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Biblioteca Central | 624.1 ALL 2a.ed. v.1 (Browse shelf(Opens below)) | Available | UNAJ25110013 | |||||||||||||||
| Biblioteca Central | 624.1 ALL 2a.ed. v.2 (Browse shelf(Opens below)) | Available | UNAJ25110014 |
Browsing Biblioteca Central shelves Close shelf browser (Hides shelf browser)
| 622.3382 SLI Worldwide practical petroleum reservoir engineering methods / H.C. "Slip" Slider. | 622.3382 WIL Waterflooding / | 624.1 ALL Production operations 1 : well completions, workover and stimulation / | 624.1 ALL 2a.ed. v.1 Production operations : well completions, workover and stimulation / | 624.1 ALL 2a.ed. v.2 Production operations : well completions, workover and stimulation / | 625.8 CON Conservación de los pavimentos de hormigón de cemento portland | 627 PET Hidráulica marítima y de estuarios / |
Incluye referencias bibliográficas.
Incluye símbolos y abreviaciones.
Incluye unidades métricas y estándares para factores de conversión métrica.
There are no comments on this title.